top of page
Cabo San Lucas

RELOCATION UPDATE

2022

Welcome to ICCSD’s relocation update page! Here, you will read about ICCSD’s relocation updates, find out how you can help and peruse ICCSD’s PhotoWall that will take us down memory lane.

Concrete Wall

WHAT DOES THIS RELOCATION ENTAIL?

We are rebuilding our entire audio, video, and lighting system from scratch. We are looking to integrate our audio, video and lighting that will eventually allow for live streaming. 

We are building three rooms that include two classrooms for our children’s ministry. These rooms will also function as fellowship rooms outside of Sunday mornings, such as Friday night ICFs.

We need to upgrade the electricity for this location because of inadequate circuits. This includes adding a sub-panel along with more circuits. The entire ceiling lights also need to be rewired.

The contractors doing the work have either been volunteers or charging minimal rates. However, the costs for audio, video, lighting, and electrical upgrades are unsurprisingly very high. The costs of building materials have almost doubled because of market conditions.

Concrete Wall

HOW CAN YOU HELP?

Costs to rebuild an entire church’s electrical circuits, sound, audio, lighting, and new walls do not come cheap in an inflationary market. Here are a few ways you can help with the renovations financially:

Zelle (Preferred)

You can donate through your bank account using ZELLE to ICCSDadmin@gmail.com

Paypal

Check

Write a check to ICCSD. Mail to 8977 Activity Road, Suite 101, San Diego, CA 92126 

(incurring no fees to ICCSD)

(incurring a 2.9% fee to ICCSD)

AmazonSmile is a program that donates 0.5% of your eligible purchases on Amazon. Read more about it below!

AmazonSmile

Simply write, "Renovation" on your check or in the appropriate space on PayPal or Zelle. All your contributions are tax deductible in the USA. 

Concrete Wall

PHOTO WALL

Photos of ICCCSD's Memory Lane

Picture Wall
Concrete Wall

PHOTO WALL

Relocation Construction Updates

bottom of page